Rebar Coating Plant Construction and Installation

Aegion Coating Services provides the equipment and training necessary to set up and operate Epoxy coating rebar plants around the globe.  Since the 1970s, we have installed and commissioned rebar coating lines all over the world from Minnesota to Florida and throughout the Middle East.  We currently have plants running that are well over 25 years old.

Features

Our turnkey products are capable of coating up to 27,000 metric tons per shift per year.  Sizes range from 8mm (.314”) through 40mm (1.57”).  In addition to shake out, transfer machines, cleaning machines, and kick out systems we offer submerged quench systems for complete cooling of the bar after the cure time has been reached.